Development of documentation for the construction of a gold
recovery plant (GRP) includes the full production cycle,
including:
- acceptance and crushing of ore, grinding and classification,
enrichment (flotation or sorption cyanidation (CIP), (CIL) or
heap leaching), production of Dore alloy (desorption,
electrolysis, smelting)
- preparation of reagents
- neutralization and filtration of tailings
As part of the design of the processing plant, design and
estimate documentation is being developed for infrastructure
facilities, including warehouses for ore, chemical reagents,
fuels and lubricants, water supply and sewerage facilities
with treatment facilities, compressed air compressor rooms,
administrative buildings and production and analytical
laboratories
Development of pre-project documentation, development of design and estimate documentation in accordance with the requirements of the Republic of Kasakhstan 1.02-03-2022, support of documentation during examinations in accordance with the requirements of the legislation of the Republic of Kazakhstan
Development of basic technical solutions
Development of a feasibility study for a gold processing plant with infrastructure facilities
Development of Basic Engineering and adaptation of Basic Engineering of foreign licensors in accordance with the requirements of the rules and regulations of the Republic of Kazakhstan
Author's supervision of construction