Mining gold plant

Development of documentation for the construction of a gold recovery plant (GRP) includes the full production cycle, including:
- acceptance and crushing of ore, grinding and classification, enrichment (flotation or sorption cyanidation (CIP), (CIL) or heap leaching), production of Dore alloy (desorption, electrolysis, smelting)
- preparation of reagents
- neutralization and filtration of tailings
As part of the design of the processing plant, design and estimate documentation is being developed for infrastructure facilities, including warehouses for ore, chemical reagents, fuels and lubricants, water supply and sewerage facilities with treatment facilities, compressed air compressor rooms, administrative buildings and production and analytical laboratories

Development of pre-project documentation, development of design and estimate documentation in accordance with the requirements of the Republic of Kasakhstan 1.02-03-2022, support of documentation during examinations in accordance with the requirements of the legislation of the Republic of Kazakhstan

Development of basic technical solutions

Development of a feasibility study for a gold processing plant with infrastructure facilities

Development of Basic Engineering and adaptation of Basic Engineering of foreign licensors in accordance with the requirements of the rules and regulations of the Republic of Kazakhstan

Author's supervision of construction

MINING INDUSTRY

ENRICHMENT PLANT ORE AND CONCENTRATE DRYING